RAXTAR at the F1 Las Vegas Grand Prix for the 3rd consecutive year

RAXTAR at the F1 Las Vegas Grand Prix for the 3rd consecutive year

RAXTAR at the F1 Las Vegas Grand Prix for the 3rd consecutive year.

Smart hoisting solutions for one of the world’s most iconic racing events.

For the third consecutive year, the Formula 1 Las Vegas Grand Prix transformed the Strip into a high-speed night circuit and once again, together with our customer Leading Edge Scaffold, RAXTAR provided safe, reliable vertical access for thousands of racegoers. 

RAXTAR supported the large-scale project with a fleet of 4 new RX Expert hoists, as well as 8 SMART hoists from previous years.

SMART hoists | RXS2340HF
↗️ Load capacity 2300 kg | 5000 lbs
↗️ Speed 36m/min | 118 fpm

Expert hoists | RX
↗️ Load capacity 3600 kg | 8000 lbs 
↗️ Speed 92 m/min | 300 fpm

Temporary pedestrian bridges, utilizing the hoists, were constructed across sections of the track, ensuring spectators and staff could move efficiently through the event. As well as the Heineken Tower, which visitors could use to ride Way Up on a RX hoist to get a beautiful vantage point of the race.

RAXTAR played a key role in the success of the event, each equipped with our cutting-edge complete data suite: RX Stellar. RX Stellar is our modular, cloud-based data suite that turns standard hoists into intelligent vertical access systems, by integrating safety systems, live monitoring, camera feeds, data insights and remote control. 

Adrian Radu, project manager at Leading Edge Scaffold had the following to say:

 

“The collaboration was seamless. RAXTAR worked closely with us, offering clear communication and practical, solutions-driven support.

Their team was responsive, hands-on, and ensured the hoists operated at peak performance with minimal downtime.“

 

The Las Vegas Grand Prix demands safe operation and flawless performance in a crowded, high-pressure environment. With thousands of spectators moving across the race circuit, uptime, safety and efficiency were essential.

Our long-standing collaboration with Leading Edge Scaffold ensured a smooth installation and swift commissioning process, critical given the tight schedule of event build-up.

Will we see you there next year?

 

Read more about this years F1 project:

Formula 1

 

Explore our solutions, let’s lift your project Way Up.

Discover our high-rise vertical access solutions

Request a quote today

Video by Aerowerx media



Deel bericht