Project Overview
No. 2 St. Michael’s is the second phase of the prestigious St. Michael’s development, a 144-metre, 41-storey tower reshaping Manchester’s skyline. The site is positioned on an extremely tight street, requiring extra careful planning for equipment placement and vertical access.
Client: Domis Construction
Segment: High-rise commercial & residential
Status: Ongoing
Location: Manchester, United Kingdom
Challenge
The restricted space required hoist ties to be installed on scaffold rather than the structure itself. Precision engineering was essential to ensure stability and safety in these conditions.
RAXTAR Solution
Domis expanded its RAXTAR fleet with two brand-new RX3245HF EXPERT Series hoists. These units were engineered to integrate seamlessly into the scaffold, delivering the required height and capacity while respecting the site’s tight constraints.
Outcome
The expert-engineered hoisting system allowed safe and efficient lifting cycles despite the limited streetscape, supporting continuous progress on one of Manchester’s flagship developments.